This manufacturing project had many unique features including the installation of a super flat floor (excess of FF-90). Oliver/Hatcher provide a creative solution that reduced by 94% the cost for leveling products for testing.

The new addition features two crane bays where the plant's automated industrial parts washing machines weighing up to 40 tons each, are positioned and tested.  Prior to having the super flat floor, Durr Automation had to use laser transit leveling and shims to level the 40’ x 15’ x 20’ machines before they could be tested. With the new super flat floor, the machines are set down by the cranes and are level without shimming.

The building's 40 ft height was designed to accommodate a 30 ft hook height for the cranes, in 70-foot spans. Columns and other structural steel were specified for the extreme loads of moving the 40-ton washing machines.

“The entire OHC team is great to work with - the entire staff is pleasant, responsive and focused on customer satisfaction. They take ownership for the project and are driven to deliver the project as if it is their own. OHC Oliver/Hatcher has proven why they came highly recommended and are at the top of my list for future work!”
DAVE HAERING, PROJECT & FACILITIES MANAGER

Plymouth Road Technical Center
Industrial Flex Facility Redevelopment
Sennett Steel
New Processing Facility